Tip 1: How to pour the floors in a private house

to independently pour a concrete floor in a private home or in the country, you do not need to have any special skills building.The main thing - is to prepare the necessary supplies, as well as to calculate the number of them.Then the casting process will be most effective and simple.Remember that the steady and level concrete floor is the perfect basis for the installation of ceramic tile and other flooring.
you need
  • - by vibrating;
  • - roofing felt;
  • - polyethylene film;
  • - concrete block;
  • - foam boards;
  • - reinforced mesh;
  • - restrictive rail;
  • - building level.
Guide
1
First prepare the base surface of the concrete floor of the future.To do this, remove the top layer of soil to the desired depth.Try to make the surface smooth as possible.Next - zatrambuyte its broken bricks and rubble, using vibratory rammer.If you do not have such a tool, and a small area of ​​the floor, you can do it manually.
2
next step is pouring the floor device water and heat insulation.It is best suite
d for this purpose roofing material.If you want to save a little on the insulation, being sure that the groundwater does not get to your floor, you can just lay several layers of a conventional polyethylene film.It all depends on your personal preferences and financial capabilities.
3
After waterproofing proceed with the laying of insulating material.This may or concrete block, or slab foam.Although this material is already outdated, but still can be used as thermal insulation and glass.If insulation of concrete floor do not forget to calculate the amount of consumables, or such repairs is costing you "a lot of money."
4
Then proceed directly to the pouring of the concrete floor.Lay it on the prepared surface, start with the far corner of the room, moving slowly toward the door.To do this, use restrictive slats, previously issued as a level.At this stage it is important that the final layer has been strengthened metal frame.Also can be used as a conventional reinforcement mesh-netting.The top layer becomes thus more shock-proof.
5
And finally, the final stage.Make accurately screed leveling layer of pure cement, diluted with water to the consistency of the liquid slurry.You can also buy for this purpose in a specialty store leveling compound.

Tip 2: How to fill the floor at home

Poured floors often used on the surface of minor irregularities.It is important to observe the technology of pouring the floor, so as not to disturb the waterproofing of the underlying premises.
How to pour the floor in the house
you need
  • - "cat"
  • - level
  • - needle roller
  • - metal profile
  • - solution
  • - waterproofing materials
Guide
1
First, we need to lay the waterproofing layer to work with the neighbors do not flood the basement or home if work is being done on the ground floor.Waterproofing can serve as a dense industrial polyethylene roll roofing and waterproofing materials.The material is rolled out on the floor so that the walls remained stock in the suggested height of the floor.If several waterproofing sheets, they should be put overlap of about 15 cm.
For waterproofing, you can not put the material, but just good to cover all joints and cracks in the floor boards or alabaster solution.One nezamazannaya crack will lead to leakage of sex, so be careful.
2
then measured the level of the floor, lay the rails.As used metal guide profiles.The guide is placed on the cardboard backing.The first guide is adjusted with the level of the rest of the first oriented, periodically checking the level readings.Between profiles kept a distance of about 70 cm, fix profiles gypsum or alabaster.
3
for heat and sound insulation under the floor can be laid polystyrene.To reduce the load on the floors at home, sometimes between the guide poured concrete block.Expanded clay can float, so it is covered with a metal grid, and just before pouring concrete block is necessary to moisten the floor primer.The primer must be specifically for liquid floors and better of the same manufacturer as the floor itself.
4
then thoroughly kneaded liquid and pour the floor between the rails.Accelerates and level the surface with a spiked roller and regulations.It is necessary to try to do a solution, then the floor will be more uniform, so take a lot of mixing capacity (over 20 liters).
begin pouring the floor should be the highest point on the surface, if you move it to the far corner of the door, then back to the exit is necessary in "Cats" - special shoes to spikes used in mountaineering.
5
Liquid floor dries very long.Terms drying range from 10 days to several months.Builders estimate drying times of about depth Floor: 1 cm floor dries 1 week.Take the time to touch or walk on the floor of the liquid, otherwise all the work will be spoiled.
Note
Experts do not recommend to fill in a new floor over the old fluid.It is better to remove the old floor down to the concrete slab.
Sources:
  • How to pour the floor
  • Gulf of floors in the building
Helpful Hint
Pouring floors in the building is carried out only after the walls and roof are made.
Sources:
  • how to pour concrete floors

0