you need
  • - ceramic tiles;
  • - hotmelt adhesive for tiles ("Plitonit-SuperKamin», «Skanfixsuper» and so forth.);
  • - Tools for plastering (trowel, spatula, kirochka etc.);
  • - cement;
  • - sand;
  • - metal brush;
  • - grid "netting" or soft wire Ø1-2 mm;
  • - electric;
  • - pobeditovye drill.
Guide
1
Clean the oven on a clay or cement plaster to the base.This work needs to be done carefully, on the surface of the bricks should be of clay or cement mortar.Remove the clay from the seams to a depth of 5-10 mm.Purification of the oven is convenient to perform a wire brush or abrasive wheel mounted on a "grinder."
2
Fix the oven on the wire mesh reinforcement.
For this hammer in nails joints between the bricks so that they towered above the cap to 10-12 mm.It is possible to drill holes in the brick body and wrap them screws or screws with a diameter slightly larger than the diameter of the holes.Attach the nails or screws grid "netting".If not, naveyte nails wire in a grid with a mesh size of 50-60 mm.
3
Oshtukaturte surface of the furnace sand and cement mortar or melting.In the first case the component ratio of 1: 2.5 or 1: 3 (cement: sand).Brand cement should not be lower than the M400.Sand should not contain clays and other impurities, it is best to use a clean river.When using hot melt as a mixture of plaster should be used by him in accordance with the instructions, fulfilling all its requirements with respect to the thickness of the layers.Depending on the brand of glue may need priming joints and laminated plastering intermittently between the overlaying layers.The plaster should hide the reinforcing mesh.The surface of the oven after plastering should be flat, the corners - vertical.
4
Fix on the furnace wall wooden guide rail so that its top edge was on the floor at a distance not exceeding the breadth of the tile.Check the level of its horizontal position.Appointment rail is to provide the horizontal rows.If you start laying directly from the floor, in case of irregularities of all ranks will also receive uneven.
5
Prepare hot melt.Pour the mixture into the prepared container, add the required amount of water and stir well.The exact procedure for the preparation of glue, while preserving their working ability and so on. Are listed in the instructions.We need to prepare no more than the amount that you will be able to use before it loses its plasticity.Some hot melts require prior application to plaster coats.
6
start laying tile from the "visible" corner of a furnace from the second row from the bottom (from the guide rail).Laying is conducted simultaneously up and away.Glue is applied wide flat spatula, flatten the best gear.The thickness of the adhesive application is governed by the instructions.To maintain a uniform gap between the rows You can use the remote crosses, do not forget to remove them before grouting.After the entire surface of the lining, carefully remove the guide rail and lay the bottom row of tiles, if necessary, carrying out its pruning.
7
Grouting is carried out after a while, it should be stated in the instructions to the hotmelt.Sometimes before grouting is required several times to heat the oven, without warming it up to high temperatures.Most often used for grouting the same glue, which was used for fixing the tiles.Seams fill rubber spatula handy, thanks to its flexibility.Excess grout from the tile removed with a damp cloth.