Tip 1: How to build a second floor

Detached house on a private plot of land - it is a comfortable and prestigious accommodation that you are, in contrast to the usual city apartment, can manage on their own.In the case of a private home, you can design its construction to the smallest detail, starting with the pouring of the foundation and finishing construction of the roof.Surely everyone will agree that the two storey house more functional and promising than a single storey , but for many people who are going to build a house on their own, the construction of the second floor is becoming a serious problem.
Guide
1
To start, determine what your house is the ceiling height.In accordance with this height to install fireproof bulkhead nailed across the middle of the height of the housing inner wall inside the hollow casing houses.Fireproof bulkheads are required in order to protect in the event of fire second floor and slow burning house.
2
to start construction of a second floor to the laying of the floor.The material
s that you choose flooring, lift up, for which pre-set the ladder on second floor.This will facilitate the work.
3
After the floor will be laid on the frame, start to collect the wall plate and went upstairs.When lifting and assembly of wall panels, keep in mind that you will work at a height, which means you need at least one assistant who will insure you and support plates for the installation.
4
temporary insurance Secure wall of planks and lift the plate in a vertical position, and then fasten them to the floor.Additionally, you can finish a balcony or conservatory, coming out of the second floor.
5
Complete construction of the building on the second floor ceiling and roof.If you work in a team with a few helpers, construction of houses will not take much of your time.

Tip 2: How to finish the second floor

Quite a lot of people engaged in the construction of two storey houses.The construction of the second floor should be performed in compliance with all rules and regulations.In addition, during the construction of the second floor should be counted every detail.This case should be treated responsibly.
How to finish the second floor
Guide
1
Before you begin construction of the second floor, practice setting lag ceiling of the second floor at the top of the first harness.This is done so that the overlap could move without problems.There put the board.The result is a temporary floor.
2
After a temporary floor is ready, install the external walls.Perform the installation of the side walls, that is, those who will rely on the rafters.Wall gable built a little later, after the rafters will be installed.If necessary, raise the side walls at a certain height.Since racks are attached to the ceiling joists, the length of the rack for the wall of the second floor will be increased by the width of the lag.
3
For the construction of the second floor, you can use the board section 150h50 mm.On the reception side walls are installing top piping (also called double).She will mauerlat.
4
Next collect an average bearing wall.This wall is the highest in the building.Its height will be about 5 meters, and it goes from the floor to the second floor and the roof ridge.The ridge of the roof rests on the upper part of this wall.Wall height is determined from the slope of the roof.The wall is also collected from the racks and each rack fixed time the struts.
5
to lift and secure the top wall of the upper board strapping nailed to the posts of the board horizontally.That will have something like a ladder.Boards need to raise the binding together.You pick up that ladder and your partner - for the oversight of a six-meter folding ladder.After installation double upper binding is complete, it can be assumed that the average wall is ready.