Tip 1: How to set the poles for the fence

Poles for fence set variety, wood, asbestos cement, iron and brick.The installation method depends on the material, but one thing unites all the pillars, they need to establish exactly, firmly, and take into account the condition of the soil.
you need
  • - cement;
  • - sand;
  • - rubble;
  • - Construction auger or spade;
  • - wire;
  • - poles;
  • - tes shuttering;
  • - plummet.
Guide
1
To set the brick pillars dig a trench for pouring the foundation.The depth of the trench do the same as when installing a greenhouse, 50-70 cm. Install formwork otsypte bottom 20-25 cm of sand and gravel, all firmly tamp and pour the foundation.The ratio of the concrete has to be like when pouring foundations and all consist of 1 part cement, three parts sand and 3 parts gravel.
2
foundation Give time for strength development, put two rows of red brick plinth.Mark the pillars.Please note the edges, then measure the entire length, divide it into equal parts and make masonry pillars.Masonry pillars entrust profess
ional bricklayer as it is a very difficult exercise.Each pillar must be in strict accordance vymeryat as in the construction of the house corners, otherwise they will have different angles and can go into different directions.In general, no experience, it is impossible to lay the pillars, though it seems a simple matter.
3
to install iron, wood, asbestos cement pillars, construction, use a drill.This will allow the smallest way to undermine the soil around the pillars, and their consolidation will take much less gravel and sand.But you can dig holes under the posts and a shovel, if the building is nowhere to get the drill failed.
4
Mark the distance, pull the wire on pegs mounted.Install posts, check for correct installation plummet, fill up the holes with gravel and sand, recheck pillars plumb, all carefully tamp.
5
to secure the poles can be used grout is the same as for pouring the foundation.To do this, the pillars evenly, fill the holes with a solution, the solution stick to tamp release bubbles that make the solution less stable.
6
If the soil in your area, sand, peat, generally unstable, then before installing the poles, bottom openings for them otsypte gravel and tamp thoroughly.Only a layer of crushed stone can be installed poles.
7
For greater strength can make the poles installed around the formwork and pour all the cement mortar.Get thin strip foundation, which posts will be secured.

Tip 2: How to install poles for the fence

If you decide to manually set the fence at the cottage or backyard, you must first set up the pillars that will hold the massive structure.To do this, you do not need skilled workers and special equipment.So how do you set the fence posts for his own?
How to install poles for the fence
you need
  • - drill;
  • - metal poles;
  • - cords;
  • - wooden wedges;
  • - sand;
  • - stones or gravel;
  • - concrete.
Guide
1
first step is to mark the place of the future of the fence, so you can determine for itself how much material is required for the supporting pillars.Drive the two extreme points of the wooden pegs and tension between the twine spacing thus alleged border fence.With straps, equal to the width and length of the column section of the fence, determine the amount of the alleged holes for pillars erected.
2
Begin drilling the holes for future columns.You can use the shovel, but quite difficult to dig deep and narrow hole.Therefore it is better for this class of hard use drill.Burite small portions of fifteen centimeters, remove and clean the tool.If you start immediately to work to a greater depth, the drill may jam and get it will be almost impossible.Pour in the water from the watering hole during the drilling process, so you will be able to facilitate the work and without a problem to pull out the drill.
3
Install extreme poles into prepared holes and fix them to the upright position.Then again, pull the cord and it will expose the intermediate pillars for the future of the fence.It is recommended to put the pillars with wooden wedges, which are installed between the pipe and the edges of the holes.Check the height of the column, if necessary, deepen the hole and backfill soil.
4
After proper exhibition pour holes around the pillars with stones, gravel or broken bricks.Then tamp thoroughly and fill with sand.So he filled the hole tightly and well settled, pour the water.For rigid external mounting supports, do large-diameter holes and pour concrete.Fill the fence will provide excellent stability, it is recommended when installing heavy walling.Cover concrete polyethylene roofing material or foil and leave to stand poles.
Sources:
  • poles exactly

0