you need
  • - Roulette;
  • - Electric perforator with drill 12 mm;
  • - Sanitary tools;
  • - power;
  • - necessary fittings (tees, valves, insulating sleeves, etc..) To connect the boiler to cold and hot water supply and sanitation;
  • - attachment (hooks 8 mm) and plastic dowels 12 mm (in the case of the through-hole - threaded hook desired length, nuts and large washers).
Guide
1
Choose where to install the boiler - wall structure should bear the weight of the water heater.Furthermore, it should be enough space for installation of the boiler.
2
Determine whether there is a possibility of connecting the boiler to the water supply, sewerage and electricity at the selected location.Evaluate the possibility of water draining into the
sewer through the safety valve over-pressure.
3
Consider options for laying pipes and cables needed to install the boiler.Consider the number of plumbing fixtures, which will be connected to the boiler.
4
Perform all work on eyeliner Communications to the boiler.To connect the power directly to the boiler must be provided with a circuit breaker.To avoid overloading the wiring, the power supply cable to bring the best to the switchboard.
5
Drill a hole in the brick or concrete walls hook to which access is most problematic.Drilling depth - the length of dowel or 5 mm deep.Drive a screw and screw the hook.If the wall is not brick or concrete, have the option of mounting through-threaded hooks over the wall.Sankabiny walls are not designed for such loads - a plaster reinforced structure mounted in the capital during construction (bathrooms in many apartment buildings).Therefore, holes are drilled through the partition sankabiny in concrete or brick main wall.The same applies to walls lined or cardboard-gypsum board.
6
Hang on a hook screwed boiler - he calmly withstand the weight of up to 200 kg.
7
Align the boiler on the wall and mark drill the remaining fixing holes.Remove the boiler and drill all marked holes.
8
Screw the pipe on the opening no more than 4 turns overpressure safety valve (if screwed more, it stops working).If necessary (if there is no counter cold water) - to set the introductory pipe strainer.
9
Connect the boiler to the water supply through a dielectric coupling and valves (if one boiler - the valve needs only cold water).Install the valve directly on the pressure relief valve is not recommended.
10
Connect the boiler to the mains.