you need
  • - Roulette;
  • - notes;
  • - handle;
  • - Calculator.
Guide
1
To calculate the required number of cubic meters of concrete blocks, and they are sold exactly cubic meters and the price at all points of trade indicated in this unit of measurement, calculate the length of all the walls, multiply the thickness and heightstructure.
2
Separately calculate the length, height and width of doors, windows, add up all the results obtained, subtract the total amount of the calculated wall.The result is divided by the volume of one block, that is, the length multiplied by the height and width.To this figure add 20% of which will go to fight when unloading and at a loss in the clutch if the foam block will cut correctly when fitti
ng sizes.The initial result of the calculation is the number of cubic meters of blocks required for the construction of your building.
3
If you do masonry from wells, the initial result of multiply by two.
4
to calculate the necessary amount of foam blocks in pieces, count how many blocks will be laying a row.To do this, add the length of the walls of the structure, divide the length of the foam concrete blocks.The width is calculated based on the fact that you will make the clutch one foam block, that is the width of the masonry will be equal to the width of the block.
5
Then make a calculation of the required number of rows, of which you are going to put the height of the building.For example, the standard height of a single-storey house is 15 rows of foam blocks;If you're tying to make two rows of timber, it is sufficient to lay out rows of blocks 14 and the top 2 rows shpalnika.Multiplying the height of 4 (if the inside of the building will take place bearing wall, then multiply by 5), divide by the height of the block.This is the number of blocks you need to put height.Multiply the blocks required for the length and get the desired result.If you do not take away from the calculated amount of windows and doors, then add 20% to the desired quantity is not necessary.