you need
  • - expanded polystyrene;
  • - primer;
  • - tile adhesive;
  • - bottom strip;
  • - electric drill with a set of drill bits pobeditovye;
  • - mixing nozzle;
  • - Belleville dowels;
  • - tanks and breeding primer adhesive;
  • - a set of construction tools (hammer, spatulas, rollers etc.).
Guide
1
Styrofoam attached to the base with glue and special fasteners - Belleville dowels (fungi) .Ochistite wall from sagging solution, dirt and dust.Prime with it any appropriate for this primer (e.g., Polymin AC-5).If the wall material has a high absorbency (Slag), prime with the wall twice.This w
ill prevent the absorption of moisture from the adhesive base.Before continuing, let time work the primer to dry.
2
to support the lower row of plates attach to the walls of the ground strips - a C-shaped profile of perforated metal.The lower edge of the strips must match the line to the wall socket interface.Fixing plugs made in 3 pieces per 1 meter length of strap.
3
Stir adhesive (polyomino P-22, ceresit CT 85 and so on.) In a strictly defined amount of water using an electric drill and mixing attachment.Some brands of adhesives require mixing with a break.Carry out this procedure in strict accordance with the instructions.
4
Apply glue to polystyrene ny leaf stripe along its perimeter at a distance of 2-3 cm from the edge, leaving small gaps to bleed air from the central zone of the plate.In the center of the sheet adhesive is applied locally, the size of missed areas should be about 10 cm.
5
Starting from the bottom corner of the wall, install the plate with the long edge on the mezzanine bar and firmly press it to the wall.Control the vertical surface plate level or plumb.When laying the second row provide a mismatch (overlapping) joints compared to the first row.Cutting boards carried out a long sharp knife.
6
installing several slabs, secure them with disc dowels pre drilled holes so deep to anchor was a wall at least 50 mm.Plate dowels must be installed flush with the surface of the insulation.This can be achieved by striking a hammer with the required force on the plate dowels or slightly flattened surface of the plate in the contact zone with nut before you install it.
7
Once the heater is attached to the entire wall, put on the surface of the adhesive layer width equal to the width of the reinforcing mesh, level of its wide spatula.On the edge of the insulation at the corners of the walls and window openings, apply perforated angle - to protect the edges of polystyrene and mechanical damage.
8
Apply a layer of glue on the reinforcing mesh, and roll it with a roller.On top of the grid and leveled with a spatula, apply another layer of glue.Once the entire wall will proarmirovana and missed glue, give it time to harden, then prime with the surface.After the primer has dried the surface of the wall will be ready for plastering.