you need
  • twine, bayonet spade, shovel, pick, buckets, rope ladder, concrete rings.
Guide
1
determine the place for future wells.Thus it is necessary to take into account the presence of a number of places with large amounts of water.So if located near a lake or river, one dig better not to try, because the soil at this location quite humid and may cause it to collapse, at a time when people will be in the hole during operation.Do not start digging the hole where the ground has subsided, because the well can be finished simply peel off and hide.
2
Mark the boundaries of the site for future wells (wells).To do this via twine dike boundary as a circle with a diameter of more than 2 meters.Clean enclosed grounds: remove the roots
of plants, and other items that may prevent digging.
3
assistant Take one or two people and start digging.For digging, you can use an ordinary bayonet with a shovel.
4
Remove the soil from the pit (hole) with the shovel, and if the depth is sufficiently large, the soil can pour in buckets and transmitted by blocks assistants who are at the top.
5
Hack in the walls of the well (well) deep ledges, so you can easily get to the surface.Or you can use a regular rope ladder, the upper end of which is necessary to securely consolidate on the surface.
6
Place in dug wells concrete rings that prevent the possible collapse of the walls.This ring can be installed without using the crane.It suffices to arrange the lever in a "pie" at the edge of the well and by fixing elements to fix it.Be sure that the lever arm from your side should be large.This will raise and lower the rings, without making great effort.
7
can set further into the finished borehole pump or classic lift mechanism for the bucket.